DWR and Reclamation are currently preparing a Plan Formulation Report for the Upper San Joaquin River Basin Storage Investigation. Simultaneously, surveys for environmental documentation and permit applications are being performed in the study area. Surveys for engineering assessments, including drilling and other geotechnical work, is continuing during the summer of 2006.
|